OnTimeIndex

Amtrak on-time performance · Northeast Corridor

Richmond / Newport News / Norfolk

Northeast Regional service. Customer on-time performance by fiscal quarter, FY22 Q1 to FY26 Q2, from the FRA's quarterly filings under 49 CFR part 273.

73%missed the 80% metric

In FY26 Q2, 73% of Richmond / Newport News / Norfolk passengers got off the train within 15 minutes of the scheduled time, short of the 80 percent the federal rule asks for. The rule's standard is 80 percent in two consecutive quarters, which the last two reported quarters did not both reach.

FY26 Q2 is Jan 1 – Mar 31, 2026, the newest quarter the FRA has published for this route, posted 2026-07-21. Federal record of past quarters, not a forecast.

Every quarter on record

1 of 18 reported quarters met the 80 percent metric.

Share of customers arriving within 15 minutes of schedule, by fiscal quarter (Q1 is October to December). Green: the quarter met the 80 percent metric. Red: it did not.

Who the delay minutes were charged to, FY26 Q2

Most delay minutes on this route were charged to the host railroads that own and dispatch the track: 43% of the total.

ResponsibilityDelay minutesSharePer 10,000 train miles
Host railroad34,94543%658
Amtrak27,21133%512
Third party19,15524%360

531,351 Amtrak train miles on the route in FY26 Q2, over 4 host railroads: Amtrak, CSX Corporation, Metro-North Railroad, Norfolk Southern. Host-responsible covers freight interference, slow orders, signals and maintenance of way; Amtrak-responsible covers equipment, crews, station dwell and holding for connections; third party covers weather, trespassers, police activity, drawbridges and customs (49 CFR 273.3).

The quarterly record

QuarterPeriodOn timeMetricHost /10KAmtrak /10KThird party /10K
FY26 Q2Jan 1 – Mar 31, 202673%missed658512360
FY26 Q1Oct 1 – Dec 31, 202577%missed612465362
FY25 Q4Jul 1 – Sep 30, 202572%missed674558359
FY25 Q3Apr 1 – Jun 30, 202564%missed839511387
FY25 Q2Jan 1 – Mar 31, 202568%missed766488326
FY25 Q1Oct 1 – Dec 31, 202467%missed727496307
FY24 Q4Jul 1 – Sep 30, 202462%missed819539414
FY24 Q3Apr 1 – Jun 30, 202464%missed917502658
FY24 Q2Jan 1 – Mar 31, 202476%missed748307317
FY24 Q1Oct 1 – Dec 31, 202373%missed730283256
FY23 Q4Jul 1 – Sep 30, 202363%missed776372301
FY23 Q3Apr 1 – Jun 30, 202371%missed691310277
FY23 Q2Jan 1 – Mar 31, 202383%met662217197
FY23 Q1Oct 1 – Dec 31, 202272%missed662329232
FY22 Q4Jul 1 – Sep 30, 202269%missed662334326
FY22 Q3Apr 1 – Jun 30, 202275%missed628263267
FY22 Q2Jan 1 – Mar 31, 202275%missed666271238
FY22 Q1Oct 1 – Dec 31, 202174%missed673256226

Informational only. The FRA's published figures for past quarters, not a prediction of any train and not live status. On time means a customer arrived no later than 15 minutes after the published scheduled arrival (49 CFR 273.5(a)).

Methodology and limits

Source: the Customer OTP Metrics, Delay Metrics and Delays per 10K TM Metric files the Federal Railroad Administration posts with each quarterly report under 49 CFR 273.5; this quarter's files are linked below. Customer on-time performance is the FRA's route-level figure, used unchanged, rounded to the whole percent here (the FRA's report floors it). It weights by passengers: a crowded late train counts more than an empty one. The 15-minute threshold is the rule's; it replaced Amtrak's older endpoint measure, which allowed a longer tolerance on longer routes, so figures before 2021 are not comparable. Delay minutes per 10,000 train miles are the route's minutes divided by its Amtrak train miles, times 10,000, by the party Amtrak coded the delay to; minutes on a host for which the FRA files no train miles count in the total but not the rate. Host railroads run most of the track outside the Northeast Corridor, which is why the split is shown. A quarter is a fiscal quarter: Q1 is October to December. One quarter can meet the metric without the route meeting the two-quarter standard. No station or train-level figures, no live status, no predictions.

Last reviewed: October 2026

← All Amtrak routes

Related tools