OnTimeIndex

Amtrak on-time performance · State Supported

Capitol Corridor

Customer on-time performance by fiscal quarter, FY22 Q1 to FY26 Q2, from the FRA's quarterly filings under 49 CFR part 273.

85%met the 80% metric

In FY26 Q2, 85% of Capitol Corridor passengers got off the train within 15 minutes of the scheduled time, at or above the 80 percent the federal rule asks for. Its last two reported quarters both met 80 percent, so the route met the rule's two-quarter standard.

FY26 Q2 is Jan 1 – Mar 31, 2026, the newest quarter the FRA has published for this route, posted 2026-07-21. Federal record of past quarters, not a forecast.

Every quarter on record

18 of 18 reported quarters met the 80 percent metric.

Share of customers arriving within 15 minutes of schedule, by fiscal quarter (Q1 is October to December). Green: the quarter met the 80 percent metric. Red: it did not.

Who the delay minutes were charged to, FY26 Q2

Most delay minutes on this route were charged to the host railroads that own and dispatch the track: 57% of the total.

ResponsibilityDelay minutesSharePer 10,000 train miles
Host railroad22,93957%870
Amtrak8,34921%317
Third party9,18923%348

263,745 Amtrak train miles on the route in FY26 Q2. Host-responsible covers freight interference, slow orders, signals and maintenance of way; Amtrak-responsible covers equipment, crews, station dwell and holding for connections; third party covers weather, trespassers, police activity, drawbridges and customs (49 CFR 273.3).

The quarterly record

QuarterPeriodOn timeMetricHost /10KAmtrak /10KThird party /10K
FY26 Q2Jan 1 – Mar 31, 202685%met870317348
FY26 Q1Oct 1 – Dec 31, 202589%met594286392
FY25 Q4Jul 1 – Sep 30, 202588%met641318359
FY25 Q3Apr 1 – Jun 30, 202591%met536236372
FY25 Q2Jan 1 – Mar 31, 202591%met515242367
FY25 Q1Oct 1 – Dec 31, 202485%met600277470
FY24 Q4Jul 1 – Sep 30, 202490%met594288343
FY24 Q3Apr 1 – Jun 30, 202490%met551248439
FY24 Q2Jan 1 – Mar 31, 202490%met528281448
FY24 Q1Oct 1 – Dec 31, 202385%met627299476
FY23 Q4Jul 1 – Sep 30, 202386%met684300452
FY23 Q3Apr 1 – Jun 30, 202387%met626280395
FY23 Q2Jan 1 – Mar 31, 202381%met984302374
FY23 Q1Oct 1 – Dec 31, 202282%met651342596
FY22 Q4Jul 1 – Sep 30, 202284%met749331406
FY22 Q3Apr 1 – Jun 30, 202288%met680257448
FY22 Q2Jan 1 – Mar 31, 202284%met940235360
FY22 Q1Oct 1 – Dec 31, 202182%met684359562

Informational only. The FRA's published figures for past quarters, not a prediction of any train and not live status. On time means a customer arrived no later than 15 minutes after the published scheduled arrival (49 CFR 273.5(a)).

Methodology and limits

Source: the Customer OTP Metrics, Delay Metrics and Delays per 10K TM Metric files the Federal Railroad Administration posts with each quarterly report under 49 CFR 273.5; this quarter's files are linked below. Customer on-time performance is the FRA's route-level figure, used unchanged, rounded to the whole percent here (the FRA's report floors it). It weights by passengers: a crowded late train counts more than an empty one. The 15-minute threshold is the rule's; it replaced Amtrak's older endpoint measure, which allowed a longer tolerance on longer routes, so figures before 2021 are not comparable. Delay minutes per 10,000 train miles are the route's minutes divided by its Amtrak train miles, times 10,000, by the party Amtrak coded the delay to; minutes on a host for which the FRA files no train miles count in the total but not the rate. Host railroads run most of the track outside the Northeast Corridor, which is why the split is shown. A quarter is a fiscal quarter: Q1 is October to December. One quarter can meet the metric without the route meeting the two-quarter standard. No station or train-level figures, no live status, no predictions.

Last reviewed: October 2026