Amtrak on-time performance · Northeast Corridor
Acela
Reported by the FRA as Acela Express in earlier quarters. Customer on-time performance by fiscal quarter, FY22 Q1 to FY26 Q3, from the FRA's quarterly filings under 49 CFR part 273.
In FY26 Q3, 77% of Acela passengers got off the train within 15 minutes of the scheduled time, short of the 80 percent the federal rule asks for. The rule's standard is 80 percent in two consecutive quarters, which the last two reported quarters did not both reach.
FY26 Q3 is Apr 1 – Jun 30, 2026, the newest quarter the FRA has published for this route, posted 2026-10-15. Federal record of past quarters, not a forecast.
Every quarter on record
7 of 19 reported quarters met the 80 percent metric.
Who the delay minutes were charged to, FY26 Q3
Most delay minutes on this route were charged to the host railroads that own and dispatch the track: 46% of the total.
| Responsibility | Delay minutes | Share | Per 10,000 train miles |
|---|---|---|---|
| Host railroad | 37,057 | 46% | 529 |
| Amtrak | 26,645 | 33% | 380 |
| Third party | 17,154 | 21% | 245 |
700,481 Amtrak train miles on the route in FY26 Q3, over 2 host railroads: Amtrak, Metro-North Railroad. Host-responsible covers freight interference, slow orders, signals and maintenance of way; Amtrak-responsible covers equipment, crews, station dwell and holding for connections; third party covers weather, trespassers, police activity, drawbridges and customs (49 CFR 273.3).
The quarterly record
| Quarter | Period | On time | Metric | Host /10K | Amtrak /10K | Third party /10K |
|---|---|---|---|---|---|---|
| FY26 Q3 | Apr 1 – Jun 30, 2026 | 77% | missed | 529 | 380 | 245 |
| FY26 Q2 | Jan 1 – Mar 31, 2026 | 67% | missed | 497 | 502 | 231 |
| FY26 Q1 | Oct 1 – Dec 31, 2025 | 76% | missed | 403 | 468 | 253 |
| FY25 Q4 | Jul 1 – Sep 30, 2025 | 76% | missed | 435 | 387 | 258 |
| FY25 Q3 | Apr 1 – Jun 30, 2025 | 77% | missed | 548 | 264 | 269 |
| FY25 Q2 | Jan 1 – Mar 31, 2025 | 77% | missed | 529 | 312 | 282 |
| FY25 Q1 | Oct 1 – Dec 31, 2024 | 76% | missed | 451 | 309 | 304 |
| FY24 Q4 | Jul 1 – Sep 30, 2024 | 70% | missed | 521 | 327 | 274 |
| FY24 Q3 | Apr 1 – Jun 30, 2024 | 76% | missed | 467 | 291 | 334 |
| FY24 Q2 | Jan 1 – Mar 31, 2024 | 84% | met | 330 | 178 | 195 |
| FY24 Q1 | Oct 1 – Dec 31, 2023 | 82% | met | 375 | 123 | 101 |
| FY23 Q4 | Jul 1 – Sep 30, 2023 | 76% | missed | 426 | 156 | 140 |
| FY23 Q3 | Apr 1 – Jun 30, 2023 | 79% | missed | 375 | 116 | 120 |
| FY23 Q2 | Jan 1 – Mar 31, 2023 | 89% | met | 281 | 64 | 97 |
| FY23 Q1 | Oct 1 – Dec 31, 2022 | 86% | met | 314 | 97 | 150 |
| FY22 Q4 | Jul 1 – Sep 30, 2022 | 77% | missed | 350 | 106 | 183 |
| FY22 Q3 | Apr 1 – Jun 30, 2022 | 84% | met | 332 | 101 | 146 |
| FY22 Q2 | Jan 1 – Mar 31, 2022 | 84% | met | 334 | 121 | 131 |
| FY22 Q1 | Oct 1 – Dec 31, 2021 | 83% | met | 346 | 77 | 143 |
By train number
The FRA also files customer on-time performance for each train number on the route. Each links to that train's quarterly record; the figure is its newest reported quarter.
- Train 210390% · FY26 Q3
- Train 210496% · FY26 Q3
- Train 210697% · FY23 Q2
- Train 210792% · FY26 Q3
- Train 210894% · FY26 Q3
- Train 210990% · FY26 Q3
- Train 211788% · FY26 Q3
- Train 212181% · FY26 Q3
- Train 212291% · FY26 Q3
- Train 212487% · FY26 Q3
- Train 212683% · FY26 Q3
- Train 2128100% · FY26 Q3
- Train 2130100% · FY26 Q2
- Train 215072% · FY26 Q3
- Train 215169% · FY26 Q3
- Train 215299% · FY26 Q3
- Train 215395% · FY26 Q3
- Train 215482% · FY26 Q3
- Train 215557% · FY26 Q3
- Train 215896% · FY26 Q3
- Train 215968% · FY26 Q3
- Train 216059% · FY26 Q3
- Train 216259% · FY26 Q3
- Train 216372% · FY26 Q3
- Train 216479% · FY24 Q2
- Train 216582% · FY26 Q3
- Train 216673% · FY26 Q3
- Train 216792% · FY26 Q3
- Train 216894% · FY26 Q3
- Train 21690% · FY26 Q2
- Train 217043% · FY26 Q3
- Train 217282% · FY26 Q3
- Train 21730% · FY26 Q2
- Train 2174100% · FY26 Q2
- Train 219095% · FY26 Q3
- Train 219379% · FY26 Q3
- Train 2203100% · FY26 Q3
- Train 220580% · FY26 Q3
- Train 2213100% · FY26 Q3
- Train 221696% · FY26 Q3
- Train 221882% · FY26 Q3
- Train 222276% · FY26 Q3
- Train 2224100% · FY26 Q3
- Train 222667% · FY26 Q3
- Train 224743% · FY26 Q1
- Train 224885% · FY26 Q3
- Train 224970% · FY26 Q3
- Train 225081% · FY26 Q3
- Train 225125% · FY26 Q2
- Train 225266% · FY26 Q3
- Train 225359% · FY26 Q2
- Train 225447% · FY26 Q3
- Train 225556% · FY26 Q3
- Train 225675% · FY26 Q3
- Train 225780% · FY26 Q3
- Train 225868% · FY26 Q3
- Train 225965% · FY26 Q3
- Train 226061% · FY26 Q3
- Train 226292% · FY26 Q3
- Train 2263100% · FY26 Q2
- Train 226535% · FY26 Q3
- Train 227176% · FY26 Q3
- Train 227552% · FY26 Q3
- Train 229095% · FY26 Q3
- Train 229291% · FY26 Q3
By station
Stations where this route's passengers got off in FY26 Q3, busiest first, with the share who arrived within 15 minutes of schedule on this route. Each links to the station's record across all its routes.
- NY Moynihan Train Hall at Penn Station84% on time · NYP
- Washington75% on time · WAS
- Philadelphia (Gray 30th St Sta)82% on time · PHL
- Boston (South Station)69% on time · BOS
- Boston (Back Bay Station)65% on time · BBY
- Route 128 (Westwood)61% on time · RTE
- Baltimore (Penn Station)77% on time · BAL
- Providence (Amtrak)60% on time · PVD
- Newark (Penn Station)83% on time · NWK
- Wilmington78% on time · WIL
- Stamford70% on time · STM
- BWI Thurgood Marshall Airport Station71% on time · BWI
- New Haven (Union Station)70% on time · NHV
- Metropark (Iselin)78% on time · MET
Informational only. The FRA's published figures for past quarters, not a prediction of any train and not live status. On time means a customer arrived no later than 15 minutes after the published scheduled arrival (49 CFR 273.5(a)).
Methodology and limits
Source: the Customer OTP Metrics, Delay Metrics and Delays per 10K TM Metric files the Federal Railroad Administration posts with each quarterly report under 49 CFR 273.5; this quarter's files are linked below. Customer on-time performance is the FRA's route-level figure, used unchanged, rounded to the whole percent here (the FRA's report floors it). It weights by passengers: a crowded late train counts more than an empty one. The 15-minute threshold is the rule's; it replaced Amtrak's older endpoint measure, which allowed a longer tolerance on longer routes, so figures before 2021 are not comparable. Delay minutes per 10,000 train miles are the route's minutes divided by its Amtrak train miles, times 10,000, by the party Amtrak coded the delay to; minutes on a host for which the FRA files no train miles count in the total but not the rate. Host railroads run most of the track outside the Northeast Corridor, which is why the split is shown. A quarter is a fiscal quarter: Q1 is October to December. One quarter can meet the metric without the route meeting the two-quarter standard. No station or train-level figures, no live status, no predictions.
- FY26 Q3 report (PDF)
- FY26 Q3 Customer OTP Metrics (xlsx)
- FY26 Q3 Delay Metrics (xlsx)
- FY26 Q3 Delays per 10K TM Metric (xlsx)
Last reviewed: October 2026
Related tools
On-time arrival rates, typical and worst-case delays, and cancellations for every airline on a U.S. route — from the DOT's on-time filings.
Open tool →Connection Risk CalculatorHow often a given layover at a connecting airport actually works, from the historical arrival record of the inbound route.
Open tool →